Change Inline Civil Labeler to a Three Data Point Process
Currently when placing an inline civil label along a drainage pipe, the prompts are 1) "Select Elements > Identify X" and 2) "Select Elements > Place Label" which sets both the rotation and placement of the label. It would be better to split...
Split Drainage Node Baseline Reference into Station Reference and Offset Reference
Drainage nodes currently utilize an Elevation Reference and a Baseline Reference. It would be better to split the Baseline Reference into two separate references, 1) "Station Reference", and 2) "Offset Reference". In practice, this would allow a n...
[RM Bridge] Enable right-click menu for the side graphic window when the main graphic windows do not show the model
This is a feature request for RM Bridge 1. When the main graphic windows show the model, the right-click menu is enabled for the the side graphic window Please refer to attached 1.png. 2. But when the main graphic windows does NOT show the model, ...