Ability to manage outer/inner pipe wall symbology separate from linear/profile symbology settings.
Need the ability to see wall symbology but not centerline. If the centerline symbology is set to construction class so are the inside/outside walls and they don't print. If the centerline is set to 255 the inside/outside walls do display in print ...
Integrate Civil File Manager with ProjectWise Explorer
Integrate Civil File Manager with ProjectWise Explorer so exporting and other workarounds are not needed. The ability to create a new version would also be nice.
Add an Interval button to the Dynamic Cross Sections
Please add an interval setting to dynamic cross sections . This will allow users to control the interval in which to view cross sections. By default the interval matches the corridor density.
Should able to modify curve IDs in horizontal and vertical geometry. And we able to have text faviroaite for annotate horizontal/vertical Curve ID in plan and profile.
Improve "Create Terrain from Design Meshes" & "Graphical Filter" tool. Filter by Fence / Shape / Reference Clip / Level Display / Selection Set
When I first saw this tool I was so excited. I could drape the design meshes from top or bottom and create a terrain . Then I started using it and realize the tool may need some improvement because it processes everything in the file or reference ...
Deed Writer Tool Enhancement to Change Begin Offset and End Offset Phrase Calculated Inserts
Please consider changing the Begin Offset and End Offset phrase calculated inserts in the respective .xml when using the Deed Writer tool. Users would prefer these calculated inserts to be absolute values in the reporting and then populate a newly...
Currently, the Migration Utilities suite of .exe files was created for 2020 R3 release of OpenRail Designer (ORD). In earlier versions of ORD, the linear and profile symbology were linked closely together, in later version of ORD (>2022) the sy...
about 2 years ago
in Workspace
3
Will not implement
A particular state DOT utilizes an integral abutment detail where the end diaphragm over the abutment is cast as part of the deck slab pour to encapsulate the ends of the steel girders or PPC I-beams (eliminating abutment joints). This end pour ov...
Developing projects requires many iterations involving multiple alternatives. For simpler projects it may be feasible to manually duplicate a corridor but as corridors get more complex this method becomes more cumbersome and prone to error. When d...