LBS allow user to change the stage a load is applied

When a load is defined in LBS, it is defined corresponding to a certain construction stage. However, there is no way to change the stage after the load is defined. The user has to delete the load and redefine it in a different stage. (e.g. allow a...
27 days ago in Analytics / OpenBridge Designer 1 Needs review

Add Strut and Tie Modeling methodology to OBD LEAP Concrete for Multi-Column Interior Bents

Since the 8th edition of AASHTO there has been more detail given on the use of Strut and Tie Modeling for the design of D-Regions in Concrete structures (AASHTO 8th & 9th Editions Section 5.8.2 and subsequent sections). In recent years there h...
3 months ago in Modeling / OpenBridge Designer 0 Future consideration

All-in-One Regression Tool

When performing regressions, we'd like a tool that functions similarly to the Corridor Objects tool: have multiple functionalities all in one dialog. If we could perform regressions and have access to things like offsets, status (use, ignore, fixe...
6 months ago in OpenRail Designer / OpenRoads Designer / Regression Analysis 2 Future consideration

Export to SHP file should automatically handle unit conversions

Users expecting an enhancement for export to SHP file function should export the data without having to change the units and handle the conversion on the fly from the selected working units if they differ from the dataset. To provide context: The ...

Restrict limits of unsuitable removal to only within grading limits

See this thread from the Bentley OpenRoads Community: https://communities.bentley.com/products/road___site_design/f/geopak-inroads-mx-openroads-forum/226295/ord-2021-r2-limits-of-unsuitable-removal
almost 3 years ago in Modeling / OpenRail Designer / OpenRoads Designer / OpenSite Designer 3 Future consideration

Deed Writer Tool Enhancement to Change Begin Offset and End Offset Phrase Calculated Inserts

Please consider changing the Begin Offset and End Offset phrase calculated inserts in the respective .xml when using the Deed Writer tool. Users would prefer these calculated inserts to be absolute values in the reporting and then populate a newly...
10 months ago in OpenRail Designer / OpenRoads Designer / OpenSite Designer / Survey 0 Future consideration

Deed Writer Tool Enhancement to Control Decimals on the Line Bearing Phrase Calculated Insert

Please consider adding the ability for the user to control decimals on the Line Bearing phrase calculated insert in the respective .xml when using the Deed Writer tool. Users would like to have control on the Line Bearing number of decimals. For e...
10 months ago in OpenRail Designer / OpenRoads Designer / OpenSite Designer / Survey 0 Future consideration

Deed Writer Tool Enhancement to Collapse Phrase Folders within the .xml by Default

Please consider adding the ability to collapse Phrase folders within the respective .xml by default. This would be beneficial to an agency if they want to keep archive phrase folders for different purposes and do not want the respective archive ph...
10 months ago in OpenRail Designer / OpenSite Designer / Survey / User Interface 0 Future consideration

Deed Writer Tool Enhancement to Bold Items from the Segments Column Once Added to the Phrases Included Column of the Right of Way Dialog Box

Please consider bolding items from the Segments column once added to the Phrases Included column of the Right of Way Deed dialog box that opens when using the Deed Writer tool. This will help users track progression of the deed description develop...
10 months ago in OpenRail Designer / OpenRoads Designer / OpenSite Designer / Survey 0 Future consideration

Deed Writer Tool Enhancement to Allow User to Scroll (Up-Down) in Areas of the Right of Way Dialog Box

Please consider adding the ability for the user to scroll (up-down) in the following areas of the Right of Way Deed dialog box that opens when using the Deed Writer tool; Segments column, Inserts column, Phrases Included column, and the white text...
10 months ago in OpenRail Designer / OpenSite Designer / Survey / User Interface 0 Future consideration