Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Functional Areas

Showing 1264

import parcels, survey chains, lines, curves, spirals from GPK

Since GEOPAK is no longer supported. I have heard from Bentley time and time again that we can get to our data out of the GPK and import it into ORD. BUT this is only true for chains, profiles and points. What about Parcels? survey chains? lines? ...
over 1 year ago in Import/Export / OpenRail Designer / OpenRoads Designer / OpenSite Designer 2 Planned

Plan-Profile-Profile drawing/sheet creation with named boundaries

Plan-Profile[LT]-Profile[RT] (and Profile[LT]-Profile[RT]) sheet creation for LT/RT split/bifurcated profile grade lines has been requested more frequently by our internal designers and our consultant designers. We have a workflow that can accompl...
about 1 year ago in Drawing Production / OpenRail Designer / OpenRoads Designer 0 Future consideration

Cut and Fill Lines Connect

In the previous Bentley software our DOT used, the software was able to connect the cut and fill lines when transitioning from cut and fill between template drops. Currently the only way that is possible is to have a feature name override on the c...
almost 2 years ago in Modeling / OpenRail Designer / OpenRoads Designer / OpenSite Designer 1 Future consideration

Skewed key stations

I had a situation where I wanted to model Interstate NB and SB as separate and cut them off of the median cl. I was unable to get the tie slopes to tie to existing ground when cutting cross sections. Adding "key stations" at a skew would resolve t...
9 days ago in Modeling 0 Needs review

Snapping to arc/spiral end in profile

I would highly recommend to let user to snap to arc or spiral end in profile design. As you can see in the attached video I can't find intersection between profile alignment and vertical line that indicates arc/spiral end. To find intersection b...
about 1 year ago in Geometry / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

Creating a Surface Area Report

A physical report containing all surface areas and total area. Application use cases for this would include: -Useful for project planning and cost estimation. -Help determine material quantities. -Assists in environmental impact assessments by pro...
4 months ago in OpenRoads Designer / Reports 0 Future consideration

port all Regression tools from OpenRail to OpenRoads

There are some regression tools that were ported from openRail into openRoads in previous releases. However, they didn't port every regression tool. Most notably, they did not port the Vertical regression tools for creating a regressed profile. We...
3 months ago in Geometry / OpenRail Designer / OpenRoads Designer / Regression Analysis 0 Future consideration

Flex Table - option to be placed plan.

There are times we create a flex table so we can add as table on our plans. Currently several steps to make it happen. (export to csv, then import the table using excel/csv) There should be a direct option/button to add/place from the flex table t...
4 months ago in Drainage and Utilities 2 Needs review
108 VOTE

Add "Point" column to the table in the Corridor Objects-Point Control window to show which point is being controlled

As a Highway Designer I want the Corridor Objects-Point Control window to include a column in the table that shows which point is being controlled so that I can sort based on that point name to quickly determine which point controls applied to tha...
over 2 years ago in Modeling / OpenRail Designer / OpenRoads Designer 1 Future consideration
102 VOTE

Ability to Delete specific Annotation group instance instead of all instances

Currently users need to remove all annotation per drawing or in all drawings with no control. An additional "Delete Drawing Annotation" with the same options as the annotate drawings one but with an additional "All Drawing Annotation Groups" optio...
over 2 years ago in Annotation / Drawing Production / OpenRail Designer / OpenRoads Designer 1 Future consideration