Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Applications

Showing 1187

Edit Civil Labels

It is cumbersome to delete Civil Labels and place new ones when a simple change is required. Similar to how Geopak Plan View Labeler worked, it would be ideal if you could edit a previously placed Civil Label. Also being able to match a Civil Labe...
over 1 year ago in Annotation / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

Corridor Flow Arrows

An option of flow arrows display for corridors would be great a great enhancement complementing already very useful contours display within corridor feature definition. A combination of these two functionalities would greatly reduce the need for t...
over 2 years ago in Modeling / OpenRail Designer / OpenRoads Designer 0 Future consideration

Variable that stores Format Options and makes them predefined in a workspace.

Currently as an OpenRoads Designer user, when the user changes the Format Options, the changes are stored on the user’s computer. This results in many different options being used in delivered reports. I would like to have an environment variable ...
over 2 years ago in OpenRail Designer / OpenRoads Designer / OpenSite Designer / Workspace 1 Future consideration

Copy multiple vertical elements

There's no option for copying multiple vertical elements - you can choose only one. My idea is to make the tool "Copy Vertical" similar to its equivalent in horizontal ("Copy Element") which allows to copy multiple elements.
over 1 year ago in Geometry / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

Group Annotations into One Annotation Group Together.

This is a request to enhance the annotation groups. Can there be a toggle in the annotation group to have the ability to group the different annotation definitions together. For example, we have lots of annotation groups that have multiple text fa...
over 1 year ago in Drawing Production / OpenRail Designer / OpenRoads Designer / OpenSite Designer 1 Future consideration

Ability to View Alignment Stationing in Plan View in ConceptStation

I am requesting an enhancement to allow the user to view alignment stationing in plan view in ConceptStation. Currently, alignment stationing can only be viewed from the profile model. This would be helpful when adding PI points or modifying horiz...
over 1 year ago in Geometry / OpenRoads ConceptStation 0 Future consideration

Productivity enhancements to Corridor Objects dialog

There are currently some things needed to be added to the Corridor Object dialog to help communicate design intent a bit better to users (especially with Parametric Constraints): The lack of information as to the rules linked to Parametric Constra...
almost 3 years ago in Modeling / OpenRail Designer / OpenRoads Designer 1 Future consideration

Automate the creation of plan-plan sheets with different views of the same station range.

We often do sheets where the same station range is shown, plan on top and bottom, but they have different information. For instance, the top plan view might be a staking overview where the bottom plan might be a jointing diagram. Both have the sam...
almost 2 years ago in Drawing Production / OpenRail Designer / OpenRoads Designer / OpenSite Designer 6 Future consideration

Use Cells for creation of sleepers

Support use of cell definitions for sleeper placements. Long sleeper sets placed at turnout locations, have variable width so these will still be using existing box shaped sleepers but normal sleepers will be using the cell based definitions. This...
almost 3 years ago in Modeling / OpenRail Designer 0 Future consideration

Cross reference plan and profile sheet number annotation form Sheet Index

Add ability to cross reference the sheet numbers of plans that are in the sheet index. IE: referencing the profile sheet number on the plan sheet and vice versa.
over 2 years ago in Annotation / OpenRail Designer / OpenRoads Designer / OpenSite Designer / User Interface 0 Future consideration