When setting a point control reference in InRoads, it would automatically set the limits to the start and end of that feature. I would like to see this as an option instead of only being able to lock to the start or end of the corridor/alignment. In addition, it should not allow you to move the point control past the extents available.
Civil Product Used | OpenRoads Designer |