The OpenSite (SiteOPS) grading tool only allows for a minimum or maximum slope for each area or for the default propertie area.
This doenst work with more chalenging terrains/projects. It should have a grading situation option:
Min and Max for FILL
Min and Max for CUT
Min and Max for Existing
In most earthworks projects, the max slope for daylight slopes changes if it is in a fill or cut situation.
Nowadays we have to set a default interval for min and max for the whole site (using the properties area) and then add grading constraints for the different situations. This takes a lot of work and is not dynamic with the process of studying different layout options.
Civil Product Used | OpenSite Designer |