Currently there are values for StationStart and StationEnd, which is dependent on the direction of the line being drawn. I am proposing an additional option to report the beginning and ending of stationing with respect to the alignment (smallest to largest - taking into account the region". Additional offset values for the methodology would also need to be taken into consideration.
This would benefit the typical reporting for schedules/tables in plans.
Civil Product Used | OpenRoads Designer, OpenRail Designer, OpenBridge Designer, OpenBridge Modeler |