Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

All ideas

Showing 1499

Flow Arrow from High to Low Point for any Civil/Linear Geometry

In placing drainage node to the carriageway or kerb/curb lines in 2D plan, it is useful to show the flow arrow from high point to low point for the drainage engineer. Currently, the flow arrow is only available in "Terrain", but not civil geometry...
over 1 year ago in Drainage and Utilities / OpenRail Designer / OpenRoads Designer / OpenSite Designer 1 Already exists

Display existing and proposed track intervals on long section tables

It would be useful if existing and proposed track intervals (6fts) could be displayed automatically in the tabulated data of a profile for a drawing.
4 months ago in Drawing Production / OpenRail Designer 0 Needs review

Variable to control 3d cut

Have a variable to would control the level of the 3d cut box.
8 months ago in Drawing Production / OpenRail Designer / OpenSite Designer 0 Future consideration

Include NR60 Mk2 turnout definition in OpenRail

NR60 Mk2 turnouts to be included by default in the standard OpenRail definitions.
over 2 years ago in Turnouts/Crossings 1 Future consideration

Static Item Type Expression values

Currently Item Types with Expressions update whenever properties are displayed. etc and are always "live" even via referencing, etc. This causes many issues where the original Excel lookup spreadsheet or Civil data is not present (when viewed in M...
over 2 years ago in Item Types / OpenBridge Designer / OpenRail Designer / OpenRoads Designer / OpenSite Designer 1 Future consideration

Lift/Lower/Slue Report

Lift/Lower/Slue Report is missing and needs adding back in as we had in PowerRail Track
about 1 year ago in OpenRail Designer / Reports 0 Planned

Regression Management Tools

Options within the software for managing imported regression points in line with the tolls we previously had in powerRail Track.
about 1 year ago in OpenRail Designer / Regression Analysis 0 Future consideration

Components of say a wingwall/abutment/pier written to their specific level

Levels would be able to turned off rather than the whole wingwall
over 2 years ago in OpenBridge Designer / OpenBridge Modeler 0 Future consideration

Calculation Summary ("Report") Improvement Suggestions

The calculation executive summary and calculation detailed summary would be improved by adding a time stamp near the date and file name at the bottom of the reports' pages. It would be helpful to be able to add a note to the reports describing tha...
4 months ago in Drainage and Utilities / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

civil cell variables with expressions and variations

When we create parametric cells, we are able to use expressions to calculate values based on inputs, and in the properties of the cell, each of the variables (listed as visible) are shown, and you can adjust the cell from there. You can also creat...
over 1 year ago in Modeling / OpenRail Designer / OpenRoads Designer / OpenSite Designer 1 Future consideration