Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

All ideas

Showing 1556

Modify the LLS part when placing a turnout.

Currently one could add an LLS part on a turnout. Unfortunately this is a standard value. Sometimes, when creating a horizontal geometry, it is necessary to ''shorten'' the LLS part (aka to place a fewer amount of long sleepers that a standard LLS...
2 months ago in OpenRail Designer / Turnouts/Crossings 0 Needs review

Create a tool that constructs transitions between different types of rail sections

Sometimes in track design, one must use different types of rails, say 60kg and 50kg rails. One could weld them and grind them together but this is a crude method. In Sweden they use what is called a transition rail, which in principle contain a sm...
2 months ago in Modeling / OpenRail Designer 0 Needs review

Legend cell of TIN files

This will be useful because it will allow us to create a legend cell of the TIN files like in GEOPAK. https://www.youtube.com/watch?v=BFVsRRx-4qY
over 2 years ago in OpenRail Designer / OpenRoads Designer / OpenSite Designer / Survey 0 Future consideration

Allow OpenRoads 2023 to Open A .dgn Sheet View Without Error

A new bug has been introduced with the release of ORD 2023. Whenever a .dgn containing a Sheet View is opened, ORD returns an error message dialogue that says, "unable to run command in sheet or drawing model" and then will not open the file until...
about 1 year ago in OpenRoads Designer 3

Annotation at interval - Omit Start/Omit End

In annotation group we can manage annotation at interval (even of) and at points where we have POB/POE. But it is not possible to ignore point of start and/or Point of end when annotation at regular interval. We can skip some specific interval usi...
4 months ago in Annotation / Drawing Production 0 Future consideration

Viewing Corridor Object and Dynamic Cross Section Tools in Read-Only

I sometimes have to look at another user's Corridor file to get additional details. If I reference in their file or open it read only, I'm not able to open up Corridor Objects to see what template they are using. It would be useful to allow me to ...
2 months ago in Modeling / OpenRail Designer / OpenRoads Designer 0 Future consideration

Designing Geometry using multiple spiral type

Currently we can set up one spiral type for one DGN. If the geometry needs to be designed using different spiral type, we need the flexibility to allow the application of multiple spiral type in one DGN
2 months ago in Geometry / OpenRail Designer 0 Needs review

Measure rail interval similar to Pro Rail extension

In Bentley Rail Track, there was an extension called Pro Rail that allows users to measure the interval between rail dynamically. Right now, we are able to report that using Station-Offset report but we are not able to track it which makes it chal...
2 months ago in OpenRail Designer 0 Needs review

Include info about side/hand of turnout from the tip of the turnout (Point 1) looking towards the toe (point 2)

Especially in reports but also in models we need to add information about turnout type including a letter showing towards which side looking from point 1 towards point 2, the branch is oriented. As it is now turnouts with Leading orientation will ...
6 months ago in Turnouts/Crossings 0 Needs review

Improve Civil Labeler placement workflow

When placing a civil labeler, the text displays the field formula and that usually is some big text. The leader placement preview takes this enormous text in consideration and 99% of the times the placement we get is off from the desired, because ...