Restrict limits of unsuitable removal to only within grading limits
See this thread from the Bentley OpenRoads Community: https://communities.bentley.com/products/road___site_design/f/geopak-inroads-mx-openroads-forum/226295/ord-2021-r2-limits-of-unsuitable-removal
Current Limitations Currently, creating overhead conductors between two "Overhead Nodes" (e.g., utility poles) results in a straight-line conduit. In reality, these lines always exhibit a natural sag due to gravity and tension forces. To model sag...
Creation of the drawing Model is Optional in sheet production in MicroStation. I believe this should be true for civil Plan as well. We should be able to create a drawing seed that does not have the option ON for creating drawing. Most of the Plan...
Allow for Densify Horizontal Value and the Densify Vertical Value fields unlocked in order to give more user control to corridor stroking
We need improved stroking control for corridors. Currently stroking for corridors is defined by configuration variables i.e. CIVIL_DEFAULT_CURVE_STROKING and CIVIL_DEFAULT_PROFILE_STROKING, for horizontal and vertical curves respectively, which ta...
The create region tool doesn't recognize visible edges from the 3d model to create closed shapes by flood. There are many instances were it is needed to calculate areas in cross sections.
Option to include a sign edge/outline when importing into DGN files
When using the SignCAD to DGN utility, the sign panel outline is obscured when the signs contain a single white border with no indentation and the fill setting enabled. To work around this, our sign designers must add an outline/no-fill shape to t...
ESRI ArcGIS import automatically handle unit conversions
We would like to see the ESRI ArcGIS import functionality enhanced to handle conversions on the fly without having to change the working units of the file. To provide context, we have a base DGN that has working and storage units for SVFT/SVIN. Th...
We need that when writing down the singular points of a railway deviation (P0, P1, P2 and P3), they are joined by straight lines P1 with P2 and P0 with P3. See attached image. In fact, the V8i version did represent the detour scheme. Thank you!
Drainage and Utilities to support non-drainage pressure pipes
Pressure pipes are essential components of many engineering systems, such as water supply, oil and gas transportation, and power generation. To design and manage these systems, engineers need features that can model the geometry and properties of ...