Improve Civil Labeler so it doesn't leave little circles in the dgn
Currently, when labels are placed, small circle elements are added to the file. While these circles are necessary for maintaining the connection between the element and the label, they present several challenges:
File Clutter: The addition of h...
Add better management tool/window for terrains sources elements
There is no effective panel for editing the terrain sources elements. The only available tools are the add/remove feature or the "Edit Terrain" tool with it's ""delete feature". All the above are extremely dependable on visual and clickable data. ...
End Area Volumes are still a contractual requirement on projects. We need a tool to correct the earthwork calculations around curves like the GEOPAK “Centroid Adjustment” tool that did that correction and provided a summary of the centroid locatio...
Many times, we have conduits/pipes that simply daylight a surface and drain on to the ground or into a pond. Please add the ability to place conduit/pipes "Without" the need of a Node. I understand that we can create a sort of null point/node that...
For our DOT, we need to show profiles for driveways. Since they are not large, it is expected to have 4 or more to a single sheet. In the current workflow, creating the drawing models and moving the drawing models to sheets to make this work is ti...
Split Cross Sections if Elements in Model Extend Outside of Default Width.
Currently our DOT requires that if ROW lines (or any element in the corridor) are outside the width of the default XS width, the user needs to create an extension or split the XS's to be able to show all design elements and ROW labels. Currently t...
We often want to show the location of cross section in plan which can be done using the named Boundary Lines but they need to be annotated so you know what each represents e.g. stations/chainages or section names such as letters etc. There is a wo...
Enhancement to Create Project Node to Element Tool
There is currently not a way to project a node from the Drainage and Utility Model to an element (horizontal alignment’s profile model). Profile runs can be created and then projected onto the profile model by conduit linkage. With this enhancemen...