Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

OpenRail Designer

Showing 971

Folders for Cant Tables

In order to use Cant Tables, a significant number of Cant Tables need to be created. As such, the ability to organize the tables into folders within the DGNLIB is needed.
about 2 years ago in CANT / OpenRail Designer 0 Future consideration

Define Template Library Name and Location from Workset creation

Add capability to define Template Libray's Name and Location through Workset creation. See attached image. This information could be populate Workset.cfg file.
about 2 years ago in OpenRail Designer / OpenRoads Designer / OpenSite Designer / Workspace 0 Future consideration

Add a "Description" entry to the Geometry Line Between Points Command

Allows the User to provide a Description for Geometry Lines; it should match the Geometry Point which already has a Description field.
about 1 year ago in Geometry / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

Allow multiple drainage node elevations to be simultaneously assigned to a terrain

It would be helpful if multiple drainage nodes could be assigned to a terrain in one step. This would solve a problem if someone deletes the proposed terrain that was used to initially layout the drainage system. Currently users have to update the...
over 1 year ago in Drainage and Utilities / Geometry / OpenRail Designer / OpenRoads Designer / OpenSite Designer 1 Already exists

Have the “Open Profile command” work on a selected linear geometry.

Now, if you select a linear entity and then take the open profile model tool,selection is not taken into account: You are aksed to select an entity. That contradicts main function of selection : Selection is typically used to indicate you want to ...
over 1 year ago in Geometry / OpenRail Designer / OpenRoads Designer / OpenSite Designer / User Interface 0 Future consideration

Edit snap rules and constraints

Constructing horizontal or vertical geometry tangents with endpoint snap rule enabled creates a one-way relationship only allows editing from one direction. In contrast, MicroStation constraints allow for two way editing. For example the coinciden...
about 2 years ago in Geometry / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

Use different feature definitions (FDs) within the same complex Element

In Rail track engineering, it is common to have an existing track and a client wants to modify its geometry, but only partially. That means that parts that are changed VS parts which remain unchanged should be marked with different FD. However, on...
over 1 year ago in Geometry / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

Analyze Trace Slope Tool enhancements

A couple suggestions for this tool: 1) Be abl e to see the dynamic slope line without first placing a line. I have to click somewhere in my file for it to place the line in the 3 D model before I am able to see the line at all. After this line is...
over 1 year ago in OpenRail Designer / OpenSite Designer / Terrain 0 Future consideration

Wants ability to put the x,y,z, of the centreline location of the crosssection in a text favorite and place this in the cross section.

Wants ability to put the x,y,z, of the centreline location of the crosssection in a text favorite and place this in the cross section. In addition the Raw data high and low coordinates of the namedboundary of a cross section are available. but whe...
10 months ago in Annotation / OpenRail Designer / OpenRoads Designer 0 Future consideration

Enable a screen-pick option when entering XY coordinates within the Survey Details window

With Inroads Survey, whenever XYZ coordinates needed to be entered for a particular purpose, a screen-pick option was always available. (see attached image) This was extremely useful. However, with ORD, changing the XYZ coordinate of any points in...
over 1 year ago in OpenRail Designer / OpenRoads Designer / OpenSite Designer / Survey 0 Future consideration