Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

OpenSite Designer

Showing 798 of 1408

User option for linear stroking when creating terrains while processing field data in 3d files.

It would be very useful to big back the user option for stroking linear elements when creating terrains. This was available in v8i and greatly enhanced our surface models. Right now there is a configuration variable but it can't be set by users. A...
10 months ago in OpenRail Designer / OpenRoads Designer / OpenSite Designer / Survey / Terrain 6 Future consideration

Configuration variable to control default path for .tiw files

When working in a fieldbook in survey, we want to set the default file path to a specific location for .tiw files. As it stands, ORD remembers the last location from which a .tiw was imported, but we want to set a file path for all users.
about 1 month ago in OpenRail Designer / OpenRoads Designer / OpenSite Designer / Survey / Workspace 0 Future consideration

File Branding Interoperability - By Schema

File branding by Product is problematic for Organizations where multiple software solution are deployed like OpenSite, OpenRoads, OpenRail and OpenBridge. The schema(s) within the file should be analyzed at file open rather than the last authoring...

Product Alignment of file vs File Schema - Need better compatibility between platform products in the same generation/schema

Please update the OpenX product(s) so that any DGN can be opened for editing no matter what product authored the file as long as it remains in the same Major schema version Suggest any DGN can be opened by any product (Site/Rail/Road/Bridge) regar...

[Terrain] Flow arrows with slope percentages

Need ability to toggle slope percentage annotations above/below the flow arrows on terrains. This will help with design and analysis. An option could be added in the flow arrow properties, please refer to the attached snapshot.
6 months ago in OpenRail Designer / OpenRoads Designer / OpenSite Designer / Terrain 1 Future consideration

Rename terrains, linear templates, surface templates and other elements by selecting from Explorer list>(right click) Properties

At the current OpenRoads version, we need to select the terrains at 3D view then click properties in order to rename. It would be better if it can be renamed just by selecting the terrain name from Explorer list>(right click) properties.
almost 2 years ago in OpenRail Designer / OpenRoads Designer / OpenSite Designer / Terrain 0 Future consideration

Parametric capability for the placement of Node and Conduit feature definitions

This would dramatically reduce the requirement for a vast number of library cells and feature definitions to be created
almost 2 years ago in Drainage and Utilities / OpenRail Designer / OpenRoads Designer / OpenSite Designer 1 Future consideration

Allow the road slope to exceed the gutter cross slope

My state agency commonly uses gutters with a 4% cross slope. The maximum superelevation rate is 7%. The gutter slope stays at 4% in this situation. Spread does not compute in this scenario because "A depressed gutter must have a Gutter Cross Slope...
about 1 year ago in Drainage and Utilities / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

Civil Cell Creator/Editor

Develop an improved Civil Cell Editor user interface. Similar to Inroads Template Library. Add features and components, define parametric constraints, create terrain/mesh. Include explorer functionality to edit individual features/components.
about 2 months ago in Modeling / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

Reassign/Reattach Civil Labels

It would be nice to have the ability to reattach civil labels to a new element or terrain. A good example is for jointing/geometric sheets with a lot of spot elevations. Fairly often a new terrain is created and the spots break and need to be repl...
about 2 years ago in Annotation / OpenRail Designer / OpenRoads Designer / OpenSite Designer 7 Future consideration