Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

OpenRoads Designer

Showing 996

Flow Arrow from High to Low Point for any Civil/Linear Geometry

In placing drainage node to the carriageway or kerb/curb lines in 2D plan, it is useful to show the flow arrow from high point to low point for the drainage engineer. Currently, the flow arrow is only available in "Terrain", but not civil geometry...
over 1 year ago in Drainage and Utilities / OpenRail Designer / OpenRoads Designer / OpenSite Designer 1 Already exists

Single Offset Partial/Entire Element creates complex elements with the ability to add/remove tapers

One of the factors prohibiting the use of civil geometry in plan production is that it can often feel cumbersome to implement design changes without 'breaking' your previous work. Let's say you have an intersection designed using civil geometry, a...
10 months ago in Geometry / OpenRail Designer / OpenRoads Designer / OpenSite Designer 1 Future consideration

Point Control lock to to start and lock to end option should honor the corridor start and end limits

Actually , the lock to start and lock to end stations are defined by the start and end of alignment or feature the corridor it is based on. This makes the point control handles (in the 2d view) to be outside the corridor limits when the corridor i...
almost 2 years ago in Modeling / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

Cross section view should show Point name of a template drop

when using the point control function. It is expected to see the names of points of a template drop in the cross section view. This would be utilized when using the point control function.
almost 2 years ago in Drawing Production / OpenRail Designer / OpenRoads Designer / OpenSite Designer 4 Already exists

civil cell variables with expressions and variations

When we create parametric cells, we are able to use expressions to calculate values based on inputs, and in the properties of the cell, each of the variables (listed as visible) are shown, and you can adjust the cell from there. You can also creat...
over 1 year ago in Modeling / OpenRail Designer / OpenRoads Designer / OpenSite Designer 1 Future consideration

Live .sgn file in OpenRoads

When the a signs is generated and saved in OpenRoads Sign CAD the user will place the sgn file in OpenRoads or any CADD application as a cell. Making changes to the SignCad sgn file must automatically update the cell already placed in the Applicat...
over 1 year ago in OpenRoads Designer / OpenRoads SignCAD 0 Future consideration

The use of regression line/points to report lift information in profiles

Currently there is not functionality to annotated lift information using regression line/points. Have you use another design alignment (in this case it would the exisitng alignment). It would be great to be able to use one data source to report sl...
almost 2 years ago in OpenRoads Designer / Regression Analysis 0 Future consideration

Civil Labeler with Null Target

Have the ability to create Civil labeler with a null Target. This will give user the ability to create label for features/lines to use from one tool and one source. Further enhancement would be able use an expression that would change the label(ca...
almost 2 years ago in Annotation / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

Openroads Drainage - HGL versus Headwater Analysis for Headwalls Inletting into a Storm Sewer System

Many times, a stream needs to be drained into a storm sewer system via a headwall. When this occurs, two analysis should be considered: The headwater at the headwall (the mechanics of the water getting into the pipe at the headwall). Generally KYT...
over 1 year ago in Drainage and Utilities / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

ORD Drainage - Show actual Tc versus Tc Minimum

Many times a calculated Time of Concentration is less than the minimum used for Intensity. When this occurs in a system of drainage areas (catchments), it helps a designer AND a reviewer to see what the actual Time of Concentration is at a given p...
over 1 year ago in Drainage and Utilities / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration