OpenBridge Modeler

Showing 182

Assign non-Active profile to bridge

Long alignments can oftentimes consist of multiple profiles that control along various segments of the alignment. Currently, only one "Active" profile can be assigned to an alignment. When creating multiple bridges along the same alignment, users ...
11 months ago in OpenBridge Modeler 0 Future consideration

Bridge drainage system

OpenBridge does not seem to have a dedicated functionality for drainage system. I have seen solution in OpenBuildings, it looks quite decent. Just to clarify, when I refer to a drainage system, I mean elements like drip pipes, scuppers, vertical p...
9 months ago in OpenBridge Modeler 0 Future consideration

Text file input for beam layouts and bridge geometry or bgs input

It would be nice if we could input a text file that contains all geometry information into the program and it would be created automatically
4 months ago in Geometry / OpenBridge Modeler 1 Future consideration

Concrete Diaphragm at Piers for Steel Girder Bridges

Concrete diaphragms can only be placed at the abutments for the bridges with steel girders at the moment. There is no option the define concrete diaphragm at the piers for steel bridges. Users should be able to define concrete diaphragms at the pi...
10 months ago in OpenBridge Modeler 0 Future consideration

Add feature definition for Approach Slab Barrier decoration

There are always production drawings where we want to turn off the approach slab and barrier wall decorations on approach slab, and only show barrier decoration on the deck. Since the barriers decoration only has a single feature definition, we ca...
2 months ago in OpenBridge Modeler 0 Future consideration

Break decks into sections

Usually, the bridge deck of a precast beam is an integral unit per span. In actual construction, the bridge deck may be constructed in sections for each beam. Is it possible to break the bridge deck into sections for each beam, and further divide ...
4 months ago in OpenBridge Modeler 0 Needs review

Add support for multiple piers/abutments on the same support line

This will be very useful for bridge widening projects. Also, consider that the support will have gaps and overlaps between supports.
10 months ago in OpenBridge Modeler 1 Future consideration

Highlight selected objects through Project Explorer

Want: Objects in model would highlight when selected through the project explorer Why: if you have multiple objects say terrains, and you need to modify them, it would be very helpful to see them highlighted through the project explorer. Often tim...

Addition of a new Linear Terrain Triangle Void Feature to automate precision Terrain triangle trimming

One very important piece of functionality that is currently missing in OpenRoads is a Linear Terrain Void feature type. This Linear Terrain feature would void/null any Terrain triangles it crosses, allowing users to add these features into their t...
over 2 years ago in OpenBridge Modeler / OpenRail Designer / OpenRoads Designer / OpenSite Designer / Terrain 2 Future consideration

OpenBridge should have a Bridge Objects utility

OBM should incorporate a Bridge Objects utility similar to the Corridor Objects in ORD. Having to go back and forth between the Explorer and the Properties panes is a clunky and inefficient workflow especially when you're typically accessing an ob...
almost 2 years ago in OpenBridge Designer / OpenBridge Modeler / User Interface 0 Future consideration