Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Applications

Showing 1366

DECORATORS APPLIED TO DRAWING AS TEXT

DECORATORS APPLIED TO DRAWING AS TEXT AS INROAD DID SO YOU CAN MOVE THEM IF ALOT OF STUFF IS ON TOP OF THEM TO SEE
almost 2 years ago in OpenRail Designer / OpenRoads Designer / OpenSite Designer / Survey 0 Future consideration

DECORTORS STAY ONE SIZE

DECORTORS STAY ONE SIZE SO YOU CAN SEE THEM UNDERITEMS
almost 2 years ago in OpenRail Designer / OpenRoads Designer / OpenSite Designer / Survey 0 Future consideration

Harvest Lengths of a cut up Linear Feature

I need a way to annotate the length of the segments of a civil feature. Linear pieces from a cut-up civil feature in the roadway corridor.
5 months ago in Annotation / Modeling / OpenRail Designer / OpenRoads Designer 0 Future consideration

Feature Defintion Toolbar - a proposal for improving this function

Feature Definition Toolbar A proposal for improving/expanding this feature Choosing Feature Definitions is a frequently used feature in OpenRoads Designer. Especially in urban projects, switching between pavement types, curbs, placing signs, s...
over 1 year ago in OpenRail Designer / OpenRoads Designer / OpenSite Designer / User Interface 0 Future consideration

The Feature Defintion toolbar - a proposal for improving this function

Feature Definition Toolbar A proposal for improving/expanding this feature Choosing Feature Definitions is a frequently used feature in OpenRoads Designer. Especially in urban projects, switching between pavement types, curbs, placing signs, s...
over 1 year ago in OpenRail Designer / OpenRoads Designer / OpenSite Designer / User Interface 0 Future consideration

Display existing and proposed track intervals on long section tables

It would be useful if existing and proposed track intervals (6fts) could be displayed automatically in the tabulated data of a profile for a drawing.
5 months ago in Drawing Production / OpenRail Designer 0 Needs review

Make Grips Visible and Useable on 4k displays

When using Grips for Structures and Pipes - the grip blends too much into the background color, and on a 4K screen is TINY. The pipe grip is annoying to select (it only appears when I select the centerline of the pipe) but when adjusting or swapin...
about 1 year ago in Drainage and Utilities / OpenRail Designer / OpenRoads Designer / OpenSite Designer / User Interface 1 Future consideration

Calculation Summary ("Report") Improvement Suggestions

The calculation executive summary and calculation detailed summary would be improved by adding a time stamp near the date and file name at the bottom of the reports' pages. It would be helpful to be able to add a note to the reports describing tha...
5 months ago in Drainage and Utilities / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

DU: Only modelling workflow

When starting a DU, OpenRoads creates a whole DU project inside the file and brings a lot of hidroly/hidraulic properties with it. That's fine if the goal is to run an analysis. But what if I just want to model a whole network and never run it? Di...
10 months ago in Drainage and Utilities / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Needs review

Update turnout library for concept station

Clearly, concept station has a lot of potential as a conceptualization tool. However, just as any other tool at its birth, has issues that needs to be adressed. I noticed that the turnout library for swedish turnouts is outdated: it does not have ...
about 1 year ago in OpenRail ConceptStation 0 Needs review