Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Geometry

Showing 189 of 1625

Finished Grade Elevations on Approach Slabs

I don't believe we can select the limits of the approach slabs when running the deck elevations report. Many DOTs require slab elevations to be reported on the approach slabs in addition to the bridge decks - adding this functionality would be gre...
2 months ago in Geometry / OpenBridge Designer / OpenBridge Modeler 1 Already exists

Make profile active without opening profile view

It would be useful if some of the profile tools (quick profile from surface, profile from surface, etc) had a toggle to allow the profile to be set as active when it is created. This would make it more efficient in cases like when you need to crea...
over 1 year ago in Geometry 1 Future consideration

Export Geometry XML from Read Only File

We have many users on the survey side that need to quickly jump in a design file and export out an alignment xml for staking. Non-Roadway users do not have write access to these files and the export geometry tool cannot be used in a read only file...
over 2 years ago in Geometry / Import/Export / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

Additional command/tool in Openroads for deleting segments/s in horizontal alignment with profile

This will be helpful especially when the certain alignments are very long, and you only need to trim segments. Currently, the viable workaround is to copy that alignment and use either Project Profile to Element tool to join the vertical alignment...
2 months ago in Geometry / OpenRail Designer / OpenRoads Designer 0 Future consideration

Add ability for Geometry build to automate station equations when joining complex geometry

In the Geometry Builder Edit, I can pick multiple geometry complex alignments and add them to create a 'combined' geometry. When I pick the multiple geometry elements and combine them, it starts with the alignment stationing of the first selected ...
over 2 years ago in Geometry / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

Auto-increment Geometry point names/numbers

Some users need to be able to assign unique point numbers. So, when creating a new geometry point, the user should be able to type in a starting point name/number (with or without a prefix) and once they place that point, it should automatically a...
about 2 years ago in Geometry / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

Modify Element (Trim/Extent)

I would ensure that my vertical and horizontal alignments are the same length by using the Trim/Extend buttonn in geomtery editior in Power Rail Track - can we have the same functionility in ORD please? I know I can snap vertical alignment to the ...
over 2 years ago in Geometry / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

Show location in plan while in profile

Currently you can use "analyze point" to see where you are at in the plan view while in a profile. I want the location line in plan to show up all the time while I am in a profile so I know where I am at.
5 months ago in Geometry / OpenRail Designer / OpenRoads Designer / User Interface 0 Future consideration

Include the ability to use the slope of a terrain when placing a Geometry Point

This would be good for 3D modelling of any item that needs to slope the same as the design surface such as guard fence terminals. This is available within the Drainage and Utilities, but when using this it loads a lot of other information into the...
7 months ago in Geometry / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

Civil arc defined by 3 tangent points

Something very useful in MicroStation and AutoCAD is the ability to define an arc by 3 tangent points. The elements could be of any type and each point would belong to a different element.
over 2 years ago in Geometry / OpenRail Designer / OpenRoads Designer / OpenSite Designer 2 Future consideration