Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Drainage and Utilities

Showing 127

DU RIM Elevation calculated from Ground Elevation offset

The RIM Elevation is a stagnant number once you enter an elevation it does not update in relation to any surface changes. RIM Elevation would be better suited for use if it can be defined with an offset. Another field would be needed: RIM Depressi...
over 2 years ago in Drainage and Utilities / OpenRail Designer / OpenRoads Designer / OpenSite Designer / User Interface 0 Future consideration

Channels Attach to other nodes besides headwall

If ditches do become channel features, KYTC would need channels to then be able to attach to other node types besides headwalls since we have many conditions and locations where they outlet into inlets of various types.
about 1 year ago in Drainage and Utilities / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Needs review

Simplfy the Interface - How many "sizes" can there be?

Object Properties - Feature Definition of a pipe is top level, its description is a pick list of diameters (TxDOT), but Utilities Properties has three different locations. This complexity is unnecessary.

Individually Define Maximum Spread

in Drainage and Utilities, remove the Maximum Spread (global for the dgn file) and make it editable for each individual node. Roadways have lots of different gutters etc so I don't want a max spread for the whole file, I want individually.
over 1 year ago in Drainage and Utilities / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Already exists

Make Grips Visible and Useable on 4k displays

When using Grips for Structures and Pipes - the grip blends too much into the background color, and on a 4K screen is TINY. The pipe grip is annoying to select (it only appears when I select the centerline of the pipe) but when adjusting or swapin...
over 1 year ago in Drainage and Utilities / OpenRail Designer / OpenRoads Designer / OpenSite Designer / User Interface 1 Future consideration

Add report for information about pipe bends

Kindly add a non-graphical way of identifying whether a pipe contains bends or not and information about the coordinates. The report is required to produce pipe setting out schedules and share the coordinates with the contractor. It would be...
over 1 year ago in Drainage and Utilities / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

Add the ability to calculate spread on two sides of a median barrier inlet

There are tens of thousands of barrier inlets on barrier medians throughout the US. Spread needs to be calculated on both sides, with the overall flow being added to the storm sewer system. Currently, the only way to do this is to create to halves...

Display and Annotate Tap Nodes in Profile Drawing

The feature name (e.g. a number) of the tap node can be labeled in the plan.The tap is visible in the "Engineering Profile".It would be helpful if this could also be displayed and labeled in the profile view/drawing. How it should work: Tap Node i...
over 2 years ago in Drainage and Utilities / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

DU: Only modelling workflow

When starting a DU, OpenRoads creates a whole DU project inside the file and brings a lot of hidroly/hidraulic properties with it. That's fine if the goal is to run an analysis. But what if I just want to model a whole network and never run it? Di...
11 months ago in Drainage and Utilities / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Needs review

Commands to Place Node and Conduit <Type> (e.g. Place Manhole, Place Stormwater Conduit)

At the moment, you run Place Node, then set the type of node by picking a feature definition. However, you normally know what type of node that you want to place, such as a manhole for example,so it would be more intuitive if the ribbon contained ...
over 2 years ago in Drainage and Utilities / OpenRail Designer / OpenRoads Designer / OpenSite Designer 1 Future consideration