Circular Eccentric Nodes should have the ability to have a rotation point at the center of the structure.
Circular eccentric nodes, like manholes, should have the ability to have a rotation point at the center of the structure and elevation reference at the center of the frame and cover.
Allow Design Scenarios to change proposed conduit properties and class based on depth of conduit.
The class of a pipe is primarily selected by the depth of cover over a pipe. Sometimes vehicle loads or construction loads have an influence on the class selection
If a drainage profile uses a cached view rather than a dynamic one, ORD will provide a notification in the bottom right-hand corner that simply says "Cached References are currently displayed. One or more cached references does not match the curre...
Add ability to set default Engineering Libraries for all users
As it stands, I can make a new Engineering Library on a network drive to share with other users, but if I wanted to make that library the "default", I can't without having to make the change for each individual user.
Maintain Item Types when extracting drainage or utility model from survey graphics.
When using "Extract From Graphic" tool to create a drainage or utility model object, the extraction process fails to bring the Item Type from the source object (in this example a surveyed gas line), leading the user to reattach the Item Type to th...
The ability to extend a profile's terrain cut using the 2D quick profile tool would be helpful for all profile types - but specifically drainage. I'd like to be able to set a buffer distance that extends existing and proposed surface cuts beyond t...
Automatically adjust structure Hight to include pipe thickness
it would be more accurate to calculate the structure Height if when a pipe is connected to a structure that the bottom base slab was adjusted to be below the wall of the pipe. this would also make the 3D model look better.
Ability to modify 'Rational Method Frequency Adjustment Factor' for a specific catchment or range of catchments.
Currently there is only an option to add Rational Method Frequency Adjustment Factors for the entire storm, which affects all catchments. Our GDOT standards require modification of the factor for only C values less than 0.6.