Allow the road slope to exceed the gutter cross slope

My state agency commonly uses gutters with a 4% cross slope. The maximum superelevation rate is 7%. The gutter slope stays at 4% in this situation. Spread does not compute in this scenario because "A depressed gutter must have a Gutter Cross Slope...
almost 2 years ago in Drainage and Utilities / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Planned

ORD Drainage - new properties for gutter spread/depth at edge of grate (not center)

Ohio DOT likes to see the spread and depth at the edge of the grate. Currently the software reports on the spread and depth at the start and end of the gutter. Would like additional properties to also report the spread and depth at the edge of the...
over 1 year ago in Drainage and Utilities 0 Planned

Flex Table - option to be placed plan.

There are times we create a flex table so we can add as table on our plans. Currently several steps to make it happen. (export to csv, then import the table using excel/csv) There should be a direct option/button to add/place from the flex table t...
7 months ago in Drainage and Utilities 2 Needs review

Drainage Profile Change Property (Color/linestyle)

Currently, Profiles are drawn according to the feat definition/element templates of a node and/or conduits. There are times we need to differentiate the difference between an existing network vs proposed. eg. all proposed are required to be solid ...
11 months ago in Drainage and Utilities / OpenRail Designer / OpenRoads Designer 4 Planned

Enhancement to Create Project Node to Element Tool

There is currently not a way to project a node from the Drainage and Utility Model to an element (horizontal alignment’s profile model). Profile runs can be created and then projected onto the profile model by conduit linkage. With this enhancemen...
about 2 years ago in Drainage and Utilities / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

Display transparent catchment boundary at the cursor when relocating an inlet.

Enable the user when relocating a catch basin to view the catchment boundary as the inlet location is adjusted. Thus, acting as a dynamic and transparent view of the catchment boundary for the inlet at the new location. This will simplify the work...
about 2 years ago in Drainage and Utilities / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

Ability to Place a Conduit/Pipe "Without" a Node

Many times, we have conduits/pipes that simply daylight a surface and drain on to the ground or into a pond. Please add the ability to place conduit/pipes "Without" the need of a Node. I understand that we can create a sort of null point/node that...

Enhancing Drainage Annotation Flexibility: Options for Maintaining Relative or Fixed Locations in Plan and Profile Views

Currently, drainage annotation will snap back to the placement location based on the placement settings within annotation groups. When I move the annotation I'd want to have the option of maintaining the location in relation to the object or maint...

Add the ability to have more than 100 active inlets.

Sometimes we need to have larger models for large projects to maintain flow continuity.
24 days ago in Drainage and Utilities / OpenRail Designer / OpenRoads Designer 1 Already exists

ORD SUDA - drainage profile view

Currently when profiling a Utility (nodes and conduits), the lines on the nodes and conduits are "closed". Old Inroads Storm/Sanitary had open connections. Agency we submit the plans want us to show that connection as open. Only option at the mome...
about 1 year ago in Drainage and Utilities 3 Planned